News

The IMMOPARK Žilina project represents a modern industrial park with premises suitable for logistics, distribution and light industry, with office spaces available, situated on a 40-hectare land between international airport and expressway D1 and D3.

About

City of Žilina is the forth largest city of Slovakia with a population of almost 90,000. The largest foreign investor in the region is the Kia Motors plant.

Project offers more than 150,000 m2 logistic and industrial buildings in 3 zones.
The halls were designed to provide maximum efficiency to any tenant and may be adapted to special requirements.  

Hall Acreage Condition
DPD 2 528 m² current
Z1 11 232 m² planned
Z2 12 125 m² current
Z2a LIBEX 9 136 m² current
Z4 3 456 m² planned
Z5 23 744 m² planned
Z6 15 552 m² planned
Z7 14 688 m² planned
Z8 19 260 m² planned
Z9 5 184 m² planned
Z10 5 760 m² planned
Z11 9 504 m² planned
Z12 6 912 m² planned

Globální mapa - Immopark Žilina

Technical Specifications

Standard Technical Specification
HALL + IN-BUILT AREA:


Basis solution

Basic grid

12 x 24 m for main Hall area, (Columns in spacing from 3,0 m)

Clear height

Min. 7,0 m Flexi space and 10,0 m for Hall objects; min. 2,8 m for in-built offices

Floor load capacity

5 t/m2 for main Hall objects; 150×150 mm – vertical load 55 kN

400 kg/m2 for in-built offices

Shell construction

Foundation

Caps footing (+ Deep foundation – concrete bored piles, in accordance with Geological surveys)

Load bearing system

Pre-cast frame from steel – reinforced concrete, (Alt. Steel structures), columns in modular system 12 × 24 m, on building perimeter each 6 m

Non-load bearing system

Gas concrete – Brickworks for the office inbuilds

Fire-resistant dividing wall panels (Alt. Gas concrete – Brickworks in the Hall)

Plasterboard partitions and suspended ceiling from cassettes only for in-built offices

Insulation

Against soil humidity PE Foil,

+ Radon insulation necessity in accordance with STN regulations

Floors

Wired concrete floor with steel fibre reinforcement, thickness approx. 180 mm,  smooth finishing of the concrete floor

Facade

Facade sandwich panels, PUR or mineral wool insulation, horizontal cladding (Panel thickness 160 mm)

Roof composition

Trapezoidal corrugated metal sheet, steam proof insulation, thermal insulation (approx. 220 mm of mineral wool), PVC foil 1,5 mm thickness

Facade openings

Windows – 5 chamber plastic profile system + Insulation Glass (a=1,4/1,4 m), including support load-bearing structures (for in-built areas)

External door – 5 chamber plastic profile system + Insulation filling (a=2,0/0,9 m), including support load-bearing structures (for main Hall object)

Interior veneered door (a=2,0/0,8 m), including door casing (for in-built areas)

Industrial sectional electronically controlled gates, size 3,0 x 3,0 m, insulated by PUR 40 mm (a=3,0/3,0 m) with hydraulic dock levelers (length 2,5m, width 2m, dynamic load bearing capacity 6000 kg), in number approx. 1 Pcs./1000 m2 for warehouse area

Drive-in sectional gates for direct access, size 3 x 4 m, manual

Technical Solutions - Žilina- Image

Technical objects - equipments

Heating and ventilation

Gas heating in warehouse/production, wall or under roof hang units (type Sahara or similar), min. heat temperature is 15ºC

Warehouse ventilation over the heating units

Radiators for In-built office area, with “under surface” piping, Min. heat temperate is 18 – 21ºC,

Separate ventilation in social areas

Air-conditioning

Local air-condition units + “under surface” piping only for In-built office area, (alt.- central unit + air-handling + “under surface” piping for bigger office premises)

Roof rain water drainage

Under pressure PVC system, „on surface“ piping, heated inlets, (in In-built office area with “under surface” piping)

Water, sewage

PVC „on surface“ piping, Sanitary installations– slightly bellow average standard (In-built office area with “under surface” piping)

Fire protection

Fire flaps and fire transmissions

Designed according to STN/EU regulations

Hydrants

Designed according to STN/EU regulations

Fire extinguishers

Designed according to STN/EU regulations

Designed according to STN/EU regulations

Roof heat and smoke domes (Roof lights), Designed according to STN/EU regulations  incl. pneumatic installation if necessary

Fire alarm system

According to STN/EU regulations

Sprinkler system

Full ESFR sprinkler system in warehouse/production if necessary, designed according to STN/EU regulations

Escape lights

Designed according to STN/EU regulations

Fire radio

Designed according to STN/EU regulations

Electrical

Cabling

On surface cabling in warehouse/production, under surface in In-built office area

Switchboard room

In accordance to STN regulations for appropriate capacity value

Sockets circuits

1 Box = 2x230V + 2x400V with circuit breaker for 24A, in number 1 Box/1000 m2  for warehouse/production space

Under window sill board PVC cable channel, sockets 4x230V + 2x Data/Telephone for 1 working place (15 m2) only in In-built office area

Forklifts recharging

Under window sill board PVC cable channel, sockets 4x230V + 2x Data/Telephone for 1 working place (15 m2) only in In-built office area

Illumination

Under window sill board PVC cable channel, sockets 4x220V + 2x Data/Telephone for 1 working place (15 m2) only in In-built office area

Under window sill board PVC cable channel, sockets 4x220V + 2x Data/Telephone for 1 working place (15 m2) only in In-built office area

Lightning and ground connection

In accordance to STN regulations

Paved areas and roads

Footpaths

Concrete pavement surface in sand bedding, + curbstones

Personal cars parking

Concrete pavement surface in sand bedding, + road curbs

Roads and rest paved areas

Concrete pavement surface in sand bedding, + road curbs

Road drainage system through oil traps – connection on public sewage

Green area

Levelling + grass

Fencing

Wire fence, fencing on yard, height approx. 1,8m, zinc- coated access gates

External illumination

In accordance to STN regulations, (5 – 25 lx – illumination level)

Tenants - Immopark Žilina

Tenants


Contacts


Letting manager

+421 918 183 000
zilina@immopark.sk

Peter Malík
Managing director
+421 2 207 23 110
office.sk@immorent.com

 

Erste Group Immorent Slovensko s. r. o.

Sídlo: Tomášikova 48, 832 52 Bratislava, Slovensko

IČO: 35734507, DIČ: 2020269339

 

Tel: +421 2 207 23 110
Email: office.sk@immorent.com

Peter Malík, managing director
Jaroslav Adolf, managing director

Vytvořeno v Idealabu.